Project description

ClientDKPK
Location:  Verhnedneprovsk
Year:   2014

Work performed

Wire sawing was carried out with the subsequent dismantling of the cut out designs of the old foundation of the boiler.

The work was done inside the working manufactory.

Produced 20 m2 of cutting. About 40 m3 of armored concrete was demolished.

.